Dr. Ashootosh S. Mandpe I डॉ. आशूतोष  मंडपे 

Assistant Professor | सहायक प्राध्यापक

Department of Civil Engineering | जनपद अभियांत्रिकी विभाग 

Indian Institute of Technology Indore | भारतीय प्रौद्योगिकी संस्थान इंदौर 

Simrol – 453552, Madhya Pradesh, India | सिमरोल – ४५३५५२, मध्यप्रदेश, भारत

Projects & Patents

Projects

Project: Vetting of ‘Adequacy Assessment Report of Effluent Treatment Plant’ prepared for Shalimar Paints Ltd.

  • Role: PI
  • Funding Agency: Nectar Enviro India Pvt Ltd
  • Cost: ₹1,35,700/-
  • Status: Completed

Project: Vetting of Design of proposed ‘Zero Liquid Discharge-Effluent Treatment Plant’ towards Development of a Zero Liquid Discharge Effluent Treatment Plant at Osmanabad

  • Role: PI
  • Funding Agency: Nectar Enviro India Pvt Ltd
  • Cost: ₹1,77,000/-
  • Status: Completed

Project: Vetting of Detailed Project Report titled Performance Evaluation of the Existing APCT with Respect to Requirement of Installation of Secondary Fugitive Emission Control System

  • Role: PI
  • Funding Agency: Nectar Enviro India Pvt Ltd
  • Cost: ₹1,77,000/-
  • Status: Completed

Project: Vetting of ‘Design of Zero Liquid Discharge-Effluent Treatment Plant (ZLD-ETP) scheme proposed in the manufacturing plant of Pidilite Industries Limited at Shirwal, Satara

  • Role: PI
  • Funding Agency: M/S. Pidilite Industries Limited
  • Cost: ₹2,95,000/-
  • Status: Completed

Project: Vetting of ‘Adequacy Assessment Report of Effluent Treatment Plant’ prepared for Shalimar Paints Ltd.

  • Role: PI
  • Funding Agency: Nectar Enviro India Pvt Ltd
  • Cost: ₹2,36,000/-
  • Status: Completed

Project: Bio-valorization of Organic Fraction of Municipal Solid Waste through Biomethanation and Composting Techniques: A Zero Waste Discharge Approach

  • Role: PI
  • Funding Agency: Indian Institute of Technology Indore
  • Cost: ₹10,00,000/-
  • Status: Ongoing

Project: Sustainable Management of Organic Waste Stream Comprising Fecal, Municipal, and Agro-Wastes Employing Resource-Recovery Approach

  • Role: PI
  • Funding Agency: Centre for Rural Development Technology, IIT Indore
  • Cost: ₹2,00,000/-
  • Status: Ongoing

Project: Narmada River Basin Management Studies in the States of Gujarat & Madhya Pradesh

  • Role: Co-PI
  • Funding Agency: Ministry of Jal Shakti
  • Cost: ₹2,00,00,000/-
  • Status: Ongoing

Project: Development of Smart and Eco-Friendly Milk Chilling Unit for Remote Areas Using Renewable Energy Sources

  • Role: PI
  • Funding Agency: Ministry of New and Renewable Energy, Government of India
  • Cost: ₹1,52,97,792/-
  • Status: Submitted

Project: Development of Integrated Strategies for Monitoring and Remediating Organochlorine Emerging Contaminants from Non-Point Sources

  • Role: PI
  • Funding Agency: DST Water Technology Call 2023
  • Cost: ₹99,98,396/-
  • Status: Submitted

Project: Sustainability Transition in the BRICS Cities: A Water-Energy-Food (WEF) Approach to Respond to Climate Change

  • Role: Co-PI
  • Funding Agency: BRICS Call for Proposals
  • Cost: ₹1,56,74,814/-
  • Status: Submitted

Project: INNOVATE – Innovative Nanomaterials from Waste for the Treatment of Effluents

  • Role: PI
  • Funding Agency: ASEAN-India Collaborative R&D Project (MEA and DST)
  • Cost: ₹34,17,518/-
  • Status: Submitted

Project: Developing a Data-Driven Decision Support System for Circular Economy in Solar Waste Management: Innovation and Optimization

  • Role: Co-PI
  • Funding Agency: Indo-Sri Lanka Joint Research Programme
  • Cost: ₹49,62,624/-
  • Status: Submitted

Project: Optimizing Processes of Biomass Material for the Development of High-Quality Bioplastics: Focus on Scalability and Practical Implementation Across Diverse Industries

  • Role: PI
  • Funding Agency: India-Taiwan Programme of Cooperation in Science & Technology
  • Cost: ₹30,00,000/-
  • Status: Submitted